Offshore Construction
» Single caisson platform installations for which Top Coat also provided the liftboat, supply boat, hammer equipment and personell:
MI 594 GA 151
HI 130 CA 13
GA 310  
» Compressor removals, installations or hook-ups:
GA 310 HI 340
MU 858 VR 309
SS 322 GA 9-A
VR 261 WC 194
BA 414  
» Install flowlines and/or risers:
GA 151 MI 560
NPI 975 WC 225
GA 182 HI 130
 
» Hurricane damage repairs on dozens of locations.
» Install, remove or repair boat landings, stairs, ladders and handrails.
» Sandblasing and painting on nearly all locations after construction.
 
Onshore Fabrication

» 1 1/2 year project for cargo ship components including:

  • 490 tons of fabricated steel structures
  • 74,000 man-hours of fabricating stainless and carbon steel piping
  • ABS approval, X-ray, hydrotesting and painting

» Fabrication of box beams to support escape vessels on drilling rigs.

» Fabrication of jet piping to assist in removing drilling rig legs from below mud line.

» Supplied welders to weld down four liftboats on semi-submersible ship for overseas transport.

» Fabrication of flowlines, stairways, ladders, handrails, etc. for platforms.